To the central content area

Polluting vehicles appeal cases management system and mobile pollution source database integration project

Absrtact
Within this project 2006, there have been 39,667 suspected polluting vehicle cases were accepted. Among the accepted cases, 22,931 vehicles have been notified to be inspected, 2,338 cases are still under processing. All the other closed cases, 2.6% is disqualified in all the notifications, compare to year 2005(which is 2.2%) the disqualification rate is higher. Under the witness of national EPBs’ directors. the lottery ceremony was held Oct.26, 2006. There were 1135 awards provided, which included 63 high value awards and 1072 regular ones. The total value is more than NT$700,000 dollars. With the accordance to the strategy 2006, there are several functions and modes of system are accomplished. Also this project has revised EPBS’ standard operation proceclure handbook. The implementation of security access has been unified by citizen digital certificate. The other system implementation includes to unite the national wide epbs’ webs to receive report cases from one web. The checking and verification process and evaluation function was accomplished. Data exchange and integration nationwide platform was built. The award recording and Web connection monitoring system and self evaluation automatical system were well established. All the function and mode have improved the quality of handle process and made to perform the aim of strategy. Two training programs and two national conferences were held within this project which provided the business connection and difficulties resolution. To accomplish the vehicles emission inspection cross platform specification, management and plan. The analytical result presents the eliminating pollutant of this project 2006 is 600Ton/yr.The elimination amount is more than last year. The mobile Web of EPA is built-up in this project. Which provides all the projects on-line review and editing. Via the web EPA can easily manage different projects and overlook the checkpoint and accomplishment. The mainframes management standard operation procedure is established.
Keyword
High polluting vehicles,appeal,mobile pollution source,database integration
Open
top